Solar Panel Installation: What to Expect from Start to Finish
Solar Panel Installation: What to Expect from Start to Finish
Going solar is a significant decision, and understanding the process helps ensure a smooth experience. Here's a detailed walkthrough of what to expect when you install solar panels with BlueSky Energy.
Phase 1: Consultation and Assessment (Week 1)
Initial Contact
Your solar journey begins with a consultation. We'll discuss your energy goals, review your electricity bills, and answer any questions you have about solar energy.
Site Assessment
Our team conducts a thorough evaluation of your property, including:
Custom System Design
Using satellite imagery and on-site data, our engineers design a system optimized for your specific home and energy needs.
Phase 2: Proposal and Financing (Week 2)
Detailed Proposal
You'll receive a comprehensive proposal including:
Contract Signing
Once you're ready to proceed, we finalize the agreement and begin the permitting process.
Phase 3: Permitting (Weeks 3-5)
Permit Application
We handle all permit applications with your local building department and utility company. This typically includes:
HOA Approval
If applicable, we coordinate with your homeowners association to ensure compliance with community guidelines.
Phase 4: Installation (Week 6)
Pre-Installation Preparation
Before installation day, we confirm all materials have arrived and schedule your installation date.
Installation Day
A typical residential installation takes 1-2 days. Here's what happens:
Day 1:
Day 2 (if needed):
Quality Assurance
Our project manager conducts a thorough inspection to ensure everything meets our high standards and local code requirements.
Phase 5: Inspection and Activation (Weeks 7-8)
Building Inspection
The local building department inspects the installation to verify code compliance and safety.
Utility Inspection
Your utility company inspects and approves the interconnection to the grid.
Permission to Operate (PTO)
Once all inspections pass, the utility grants permission to operate. This is when your system goes live and starts generating power!
Phase 6: Monitoring and Support (Ongoing)
System Activation
We walk you through your monitoring system so you can track your energy production in real-time via smartphone or computer.
Ongoing Support
BlueSky Energy provides:
Tips for a Smooth Installation
1. Clear the area - Remove vehicles from the driveway and clear any obstacles near the installation area
2. Secure pets - Keep pets inside or in a secure area away from the work zone
3. Be available - Someone should be home during installation in case questions arise
4. Plan for brief outages - The electrical connection may require short power interruptions
Ready to Get Started?
The entire process typically takes 6-8 weeks from contract signing to system activation. Contact BlueSky Energy today to schedule your free consultation and take the first step toward energy independence.